Revitalization of the hall in the Tatry complex
Before the renovation, the hall was used as a warehouse. Now, the space will be used for special and technically demanding modifications to Tatra vehicles.
- We dismantled all technical equipment (ventilation, piping, electrical wiring) in the affected part of the hall.
- We then repaired the interior walls of the hall, the roof of the hall, including the skylight, and installed a new floor, including an assembly pit, insulated the building with mineral wool sandwich panels, and also insulated it with 100 mm thick polystyrene, including plaster.
- We installed new electrical wiring and lighting.
- We also installed new hot water heating, ventilation, and air and corgon piping in the hall.
Inside the hall, we built a new built-in unit (storage for overhead materials, men's/women's toilets, a cleaning room, and a break room).
Client: TATRA TRUCKS
Total price: CZK 26 million
Completion date: April 22, 2024 - September 30, 2024